![]() Besides this data that the user maintains, there is also data that is automatically updated by the system (management Data). The change master record contains data of a descriptive character (such as the reason for the Change) and control data (such as effectivity data, object type indicators). The change master record is a master record that contains information necessary for the È A change master record or ECR/ECO controls and documents the changes. È The changed object is saved twice: in its state before and after the changes. È It takes effect under precisely defined conditions (precise date or specific effectivity Engineering Change Management in SAP is a process given for to change various aspects of production Basic Data ( For Example BOMs, Task Lists ,Materials, and Documents) with history ( with date effectivity ) or depending upon specific Conditions (with parameter effectivity )Ī change with history has the following distinctive characteristics:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |